2005 - 2007 Loop 306, Pulliam Street and FM 380 Construction

 

2005 - 2007
Loop 306 at FM 380 Construction
 

TxDOT is overseeing this $12.4 million Pulliam Street/FM 380 overpass project, which includes connections to the Loop 306-U.S. Highway 67 interchange. The project began in June 2005 and is scheduled for completion in December 2007

August 2007:

Pulliam Intersection  Loop 306 @ FM 380 road closed-August 2007 Loop 306 @ FM 380-August 2007 Loop 306 @ FM 380 North Loop 306 @ FM 380 facing North
Pulliam Street Loop 306        

 
January 2008:
Mustangs Mustangs 2 Loop 306 sign

  
February 2008:
Loop 306 Pulliam bridge Pulliam bridge 2    
 

 

 